There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.
In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:
a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.
b. After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.
Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.
Q.
The number of SE in T1 and T5 for the projects in the third month are, respectively:​
  • a)
    (0,2)
  • b)
    (0,3)
  • c)
    (1,2)
  • d)
    (1,3)
Correct answer is option 'A'. Can you explain this answer?
Verified Answer
There are 21 employees working in a division, out of whom 10 are speci...
Number of Special Skilled Employees (SE) = 10
Number of Regular Skilled Employees (RE) = 11
Number of SE in T1 in third month = 0
Number of SE in T5 in third month = 2
Option (A)
View all questions of this test
Most Upvoted Answer
There are 21 employees working in a division, out of whom 10 are speci...


Understanding the given information:
- The division has 21 employees, with 10 special-skilled employees (SE) and 11 regular-skilled employees (RE).
- There are 25 projects in total, with 5 challenging projects and 20 standard projects.
- Five teams (T1, T2, T3, T4, T5) work on one project each month, with the challenging project assigned to a different team each month.

Team composition and changes:
- Team T1 has 1 more SE than T2, T2 has 1 more SE than T3, and so on, with T4 having 1 more SE than T5.
- Each month, the team assigned the challenging project gets 2 SE from the previous month's challenging project team, and 1 RE is shifted from the former team to the latter team.
- If T1 has any SE and T5 has any RE, 1 SE is shifted from T1 to T5 and 1 RE from T5 to T1. Similarly, if T2 has any SE and T4 has any RE, 1 SE is shifted from T2 to T4 and 1 RE from T4 to T2.

Determining the number of SE in T1 and T5 for the third month:
- In the first month, T1 has the challenging project and thus has an extra SE compared to T2.
- In the second month, T2 gets the challenging project and receives 2 SE from T1, while T1 loses 1 SE and gains 1 RE.
- In the third month, T3 receives 2 SE from T2, and T2 loses 1 SE and gains 1 RE.
- By this logic, in the third month, T1 will have 0 SE and T5 will have 2 SE, as the SEs are shifted between teams according to the given rules.

Therefore, the number of SE in T1 and T5 for the projects in the third month are (0, 2), which corresponds to option A.
Attention CAT Students!
To make sure you are not studying endlessly, EduRev has designed CAT study material, with Structured Courses, Videos, & Test Series. Plus get personalized analysis, doubt solving and improvement plans to achieve a great score in CAT.
Explore Courses for CAT exam

Similar CAT Doubts

There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a.The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.The number of times in which the composition of team T2 and the number of times in which composition of team T 4 remained unchanged in two successive months are

There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b. After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.One of the employees named Aneek scored 183 points. Which of the following CANNOT be true?

There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a.The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.Which of the following CANNOT be the total credit points earned by any employee from the projects?

There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.The number of SE in T1 and T5 for the projects in the third month are, respectively:​a)(0,2)b)(0,3)c)(1,2)d)(1,3)Correct answer is option 'A'. Can you explain this answer?
Question Description
There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.The number of SE in T1 and T5 for the projects in the third month are, respectively:​a)(0,2)b)(0,3)c)(1,2)d)(1,3)Correct answer is option 'A'. Can you explain this answer? for CAT 2024 is part of CAT preparation. The Question and answers have been prepared according to the CAT exam syllabus. Information about There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.The number of SE in T1 and T5 for the projects in the third month are, respectively:​a)(0,2)b)(0,3)c)(1,2)d)(1,3)Correct answer is option 'A'. Can you explain this answer? covers all topics & solutions for CAT 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.The number of SE in T1 and T5 for the projects in the third month are, respectively:​a)(0,2)b)(0,3)c)(1,2)d)(1,3)Correct answer is option 'A'. Can you explain this answer?.
Solutions for There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.The number of SE in T1 and T5 for the projects in the third month are, respectively:​a)(0,2)b)(0,3)c)(1,2)d)(1,3)Correct answer is option 'A'. Can you explain this answer? in English & in Hindi are available as part of our courses for CAT. Download more important topics, notes, lectures and mock test series for CAT Exam by signing up for free.
Here you can find the meaning of There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.The number of SE in T1 and T5 for the projects in the third month are, respectively:​a)(0,2)b)(0,3)c)(1,2)d)(1,3)Correct answer is option 'A'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.The number of SE in T1 and T5 for the projects in the third month are, respectively:​a)(0,2)b)(0,3)c)(1,2)d)(1,3)Correct answer is option 'A'. Can you explain this answer?, a detailed solution for There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.The number of SE in T1 and T5 for the projects in the third month are, respectively:​a)(0,2)b)(0,3)c)(1,2)d)(1,3)Correct answer is option 'A'. Can you explain this answer? has been provided alongside types of There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.The number of SE in T1 and T5 for the projects in the third month are, respectively:​a)(0,2)b)(0,3)c)(1,2)d)(1,3)Correct answer is option 'A'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice There are 21 employees working in a division, out of whom 10 are special-skilled employees (SE) and the remaining are regular-skilled employees (RE). During the next five months, the division has to complete five projects every month. Out of the 25 projects, 5 projects are "challenging", while the remaining ones are "standard". Each of the challenging projects has to be completed in different months. Every month, five teams - Tl, T2, T3, T4 and T5, work on one project each. Tl, T2, T3, T4 and T5 are allotted the challenging project in the first, second, third, fourth and fifth month, respectively. The team assigned the challenging project has one more employee than the rest.In the first month, T1 has one more SE than T2, T2 has one more SE than T3, T3 has one more SE than T4, and T 4 has one more SE than T5. Between two successive months, the composition of the teams changes as follows:a. The team allotted the challenging project, gets two SE from the team which was allotted the challenging project in the previous month. In exchange, one RE is shifted from the former team to the latter team.b.After the above exchange, if T1 has any SE and T5 has any RE, then one SE is shifted from T1 to T5, and one RE is shifted fromT5 to Tl. Also, if T2 has any SE and T4 has any RE, then one SE is shifted fromT2 to T4, and one RE is shifted from T4 to T2.Each standard project has a total of 100 credit points, while each challenging project has 200 credit points. The credit points are equally shared between the employees included in that team.Q.The number of SE in T1 and T5 for the projects in the third month are, respectively:​a)(0,2)b)(0,3)c)(1,2)d)(1,3)Correct answer is option 'A'. Can you explain this answer? tests, examples and also practice CAT tests.
Explore Courses for CAT exam

Top Courses for CAT

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev