CLAT Exam  >  CLAT Questions  >   DIRECTIONS for the question: Read the inform... Start Learning for Free
DIRECTIONS for the question: Read the information given below and answer the question that follows.
The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.
The machine in cell 7 receives its raw material in the end of the ……second.
  • a)
    12th
  • b)
    13th
  • c)
    14th
  • d)
    15th
Correct answer is option 'B'. Can you explain this answer?
Verified Answer
DIRECTIONS for the question: Read the information given below and ans...
‘√’ indicates that the robot is in transit.
From the table, the machine in cell 7 receives the raw material in the end of the 13th second.
View all questions of this test
Explore Courses for CLAT exam

Similar CLAT Doubts

DIRECTIONS for the question:Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines.1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way.2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations.3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way)4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first.5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.Q. The machine in cell 7 receives its raw material in the end of the ……second.

DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.Where will the robot be at the end of the 10th second?

DIRECTIONS for the question:Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines.1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way.2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations.3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way)4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first.5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.Q. Where will the robot be at the end of the 10thsecond?

DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.The time lag = (Time at which the robot delivers the raw material) – (Time at which the signal is sent by the cell) – 1 The time lag is maximum for a machine in which of the following cells in the first minute?

DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.If there are no other signals in the first minute, then the robot will be idling in cell 9 for what fraction of a minute?

Top Courses for CLAT

DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.The machine in cell 7 receives its raw material in the end of the ……second.a)12thb)13thc)14thd)15thCorrect answer is option 'B'. Can you explain this answer?
Question Description
DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.The machine in cell 7 receives its raw material in the end of the ……second.a)12thb)13thc)14thd)15thCorrect answer is option 'B'. Can you explain this answer? for CLAT 2024 is part of CLAT preparation. The Question and answers have been prepared according to the CLAT exam syllabus. Information about DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.The machine in cell 7 receives its raw material in the end of the ……second.a)12thb)13thc)14thd)15thCorrect answer is option 'B'. Can you explain this answer? covers all topics & solutions for CLAT 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.The machine in cell 7 receives its raw material in the end of the ……second.a)12thb)13thc)14thd)15thCorrect answer is option 'B'. Can you explain this answer?.
Solutions for DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.The machine in cell 7 receives its raw material in the end of the ……second.a)12thb)13thc)14thd)15thCorrect answer is option 'B'. Can you explain this answer? in English & in Hindi are available as part of our courses for CLAT. Download more important topics, notes, lectures and mock test series for CLAT Exam by signing up for free.
Here you can find the meaning of DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.The machine in cell 7 receives its raw material in the end of the ……second.a)12thb)13thc)14thd)15thCorrect answer is option 'B'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.The machine in cell 7 receives its raw material in the end of the ……second.a)12thb)13thc)14thd)15thCorrect answer is option 'B'. Can you explain this answer?, a detailed solution for DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.The machine in cell 7 receives its raw material in the end of the ……second.a)12thb)13thc)14thd)15thCorrect answer is option 'B'. Can you explain this answer? has been provided alongside types of DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.The machine in cell 7 receives its raw material in the end of the ……second.a)12thb)13thc)14thd)15thCorrect answer is option 'B'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice DIRECTIONS for the question: Read the information given below and answer the question that follows.The floor of a workshop is in the shape of a square where four machines are in cells 1, 3, 5 and 7. In cell 9, in the centre, a robot is placed which supplies raw material to all the four machines. 1. The finished product from cell 1 is passed to cell 2, cell 3 to cell 4, cell 5 to cell 6 and cell 7 to cell 8 through a conveyor belt. Every machine sends a signal to the robot, one second before it needs a material. The robot receives the signal without any time delay and supplies the material to respective machine and comes back. It takes one second each way. 2. If there is more than one signal at a time, then it supplies material to the machine whose cell number is smaller as the cells are numbered as per the importance of their operations. 3. When there are no signals from cells 1, 3, 5 or 7, the robot checks the availability of the finished goods in cell 2, 4, 6 and 8 without any time lag and brings them to cell 9 in 4 seconds (2 seconds each way) 4. If there is a signal from cells 1, 3, 5 and 7 when the robot is bringing finished goods, they are executed after the robot comes back. If in those two seconds there are more than 2 signals, then they are executed in the sequence in which they were made and if made simultaneously, the one from the cell with a smaller number is executed first. 5. There is a conveyor belt attached to the centre cell, which supplies the raw material and takes away the finished goods continuously. If a robot receives a signal in the beginning of the 1st, 3rd, 8th, 9th, second from cells 3, 1, 5 and 7 respectively and recognizes the availability of the finished good in cell 6 in the beginning of the seventh second, then answer the following questions.The machine in cell 7 receives its raw material in the end of the ……second.a)12thb)13thc)14thd)15thCorrect answer is option 'B'. Can you explain this answer? tests, examples and also practice CLAT tests.
Explore Courses for CLAT exam

Top Courses for CLAT

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev