While preparing an estimate it is not possible to work out details of Petty Items (insignificant with respect to civil engineering) hence their lumpsum value is considered. Following are Items and their lumpsum cost:
- Contingency = 3% to 5% of project cost
- Work Charge Establishment = 1.5 - 2% of project cost
- Tools and Plants = 1% - 1.5% of project cost
- Departmental Cost (Engineering cost) = 10 - 15% of project cost
- Sanitary and Water Supply = 8% of project cost
- Electrification = 8% of project cost
Approximate cost for water supply isa)4 to 5% of estimated cost of the...
Approximate cost for water supply:
The approximate cost for water supply in a building project can vary depending on various factors such as the size of the building, the complexity of the plumbing system, and the region where the project is located. However, it is generally estimated as a percentage of the total cost of the building works.
a) 4 to 5% of estimated cost of the building works:
This option suggests that the approximate cost for water supply would be 4 to 5% of the estimated cost of the building works. This means that if the total estimated cost of the building works is $100,000, then the approximate cost for water supply would be $4,000 to $5,000.
b) 2 to 3% of estimated cost of the building works:
This option suggests a lower percentage range for the approximate cost of water supply. If the total estimated cost of the building works is $100,000, then the approximate cost for water supply would be $2,000 to $3,000.
c) 5 to 7% of estimated cost of the building works:
This option suggests a higher percentage range for the approximate cost of water supply. If the total estimated cost of the building works is $100,000, then the approximate cost for water supply would be $5,000 to $7,000.
d) 1 to 2% of estimated cost of the building works:
This option suggests the lowest percentage range for the approximate cost of water supply. If the total estimated cost of the building works is $100,000, then the approximate cost for water supply would be $1,000 to $2,000.
Correct answer:
The correct answer is option 'C', which suggests that the approximate cost for water supply is 5 to 7% of the estimated cost of the building works. This range provides a reasonable estimate for the cost of water supply in a building project, taking into account the various factors involved in the plumbing system installation.