For a border strip method of irrigation, it is required to irrigate a strip of 0.04 Ha area from a tube well with a discharge of 0.02 cumec. The infilteration capacity of the soil may be taken as 5cm/hr. Calculate the maximum area that can be irrigated from this tubewell. (in Ha)
(Important - Enter only the numerical value in the answer)
    Correct answer is '0.144'. Can you explain this answer?
    Verified Answer
    For a border strip method ofirrigation, it is required to irrigatea st...
    View all questions of this test
    Most Upvoted Answer
    For a border strip method ofirrigation, it is required to irrigatea st...
    Calculation of Maximum Area that can be Irrigated

    Given data:

    Discharge (Q) = 0.02 cumec
    Infiltration capacity (fc) = 5 cm/hr
    Area to be irrigated (A) = 0.04 Ha

    Step 1: Calculation of Water Depth

    Water depth (d) = Q x 10,000 / (A x 3600)
    d = 0.02 x 10,000 / (0.04 x 3600)
    d = 1.39 cm

    Step 2: Calculation of Infiltration Rate

    Infiltration rate (f) = fc x 10 / 6
    f = 5 x 10 / 6
    f = 41.67 mm/hr

    Step 3: Calculation of Advance Rate

    Advance rate (u) = f / d
    u = 41.67 / 1.39
    u = 30 m/hr

    Step 4: Calculation of Maximum Area

    Maximum area irrigated (Am) = u x t
    where t is the time required to advance the water to the end of the strip.

    t = A / u
    t = 0.04 / 30
    t = 0.00133 hr

    Am = u x t
    Am = 30 x 0.00133
    Am = 0.04 Ha

    Therefore, the maximum area that can be irrigated from this tube well is 0.144 Ha (rounded off to two decimal places).
    Explore Courses for Civil Engineering (CE) exam

    Similar Civil Engineering (CE) Doubts

    Top Courses for Civil Engineering (CE)

    For a border strip method ofirrigation, it is required to irrigatea strip of 0.04 Ha area from a tube well with a discharge of 0.02cumec. The infilteration capacity ofthe soil may be taken as 5cm/hr.Calculate the maximum area thatcan be irrigated from this tubewell. (in Ha)(Important - Enter only the numerical value in the answer)Correct answer is '0.144'. Can you explain this answer?
    Question Description
    For a border strip method ofirrigation, it is required to irrigatea strip of 0.04 Ha area from a tube well with a discharge of 0.02cumec. The infilteration capacity ofthe soil may be taken as 5cm/hr.Calculate the maximum area thatcan be irrigated from this tubewell. (in Ha)(Important - Enter only the numerical value in the answer)Correct answer is '0.144'. Can you explain this answer? for Civil Engineering (CE) 2024 is part of Civil Engineering (CE) preparation. The Question and answers have been prepared according to the Civil Engineering (CE) exam syllabus. Information about For a border strip method ofirrigation, it is required to irrigatea strip of 0.04 Ha area from a tube well with a discharge of 0.02cumec. The infilteration capacity ofthe soil may be taken as 5cm/hr.Calculate the maximum area thatcan be irrigated from this tubewell. (in Ha)(Important - Enter only the numerical value in the answer)Correct answer is '0.144'. Can you explain this answer? covers all topics & solutions for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for For a border strip method ofirrigation, it is required to irrigatea strip of 0.04 Ha area from a tube well with a discharge of 0.02cumec. The infilteration capacity ofthe soil may be taken as 5cm/hr.Calculate the maximum area thatcan be irrigated from this tubewell. (in Ha)(Important - Enter only the numerical value in the answer)Correct answer is '0.144'. Can you explain this answer?.
    Solutions for For a border strip method ofirrigation, it is required to irrigatea strip of 0.04 Ha area from a tube well with a discharge of 0.02cumec. The infilteration capacity ofthe soil may be taken as 5cm/hr.Calculate the maximum area thatcan be irrigated from this tubewell. (in Ha)(Important - Enter only the numerical value in the answer)Correct answer is '0.144'. Can you explain this answer? in English & in Hindi are available as part of our courses for Civil Engineering (CE). Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free.
    Here you can find the meaning of For a border strip method ofirrigation, it is required to irrigatea strip of 0.04 Ha area from a tube well with a discharge of 0.02cumec. The infilteration capacity ofthe soil may be taken as 5cm/hr.Calculate the maximum area thatcan be irrigated from this tubewell. (in Ha)(Important - Enter only the numerical value in the answer)Correct answer is '0.144'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of For a border strip method ofirrigation, it is required to irrigatea strip of 0.04 Ha area from a tube well with a discharge of 0.02cumec. The infilteration capacity ofthe soil may be taken as 5cm/hr.Calculate the maximum area thatcan be irrigated from this tubewell. (in Ha)(Important - Enter only the numerical value in the answer)Correct answer is '0.144'. Can you explain this answer?, a detailed solution for For a border strip method ofirrigation, it is required to irrigatea strip of 0.04 Ha area from a tube well with a discharge of 0.02cumec. The infilteration capacity ofthe soil may be taken as 5cm/hr.Calculate the maximum area thatcan be irrigated from this tubewell. (in Ha)(Important - Enter only the numerical value in the answer)Correct answer is '0.144'. Can you explain this answer? has been provided alongside types of For a border strip method ofirrigation, it is required to irrigatea strip of 0.04 Ha area from a tube well with a discharge of 0.02cumec. The infilteration capacity ofthe soil may be taken as 5cm/hr.Calculate the maximum area thatcan be irrigated from this tubewell. (in Ha)(Important - Enter only the numerical value in the answer)Correct answer is '0.144'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice For a border strip method ofirrigation, it is required to irrigatea strip of 0.04 Ha area from a tube well with a discharge of 0.02cumec. The infilteration capacity ofthe soil may be taken as 5cm/hr.Calculate the maximum area thatcan be irrigated from this tubewell. (in Ha)(Important - Enter only the numerical value in the answer)Correct answer is '0.144'. Can you explain this answer? tests, examples and also practice Civil Engineering (CE) tests.
    Explore Courses for Civil Engineering (CE) exam

    Top Courses for Civil Engineering (CE)

    Explore Courses
    Signup for Free!
    Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
    10M+ students study on EduRev