Read the following scenarios scenario 1. 1 factory can produce 1000 widgets with 200 hours of labour and 20 pounds of raw material another factory can produce 1000 widget with 100 hours of labour in 20 pounds of raw material .
scenario 2: A dress maker can sew 800 garments with 160 bolts of clothes and 3000 hours of labour . another dress maker can sew 800 garments for 200 bolts of clothes and 2000 hours of identical labour cloth cost rupees 80 A bolt and labour cost rs 50 an hour .
for each scenario comment if
is it possible for both methods to be technically efficient why or why not
b. is it possible that both of these production processes are economically efficient
i
i?
Most Upvoted Answer
Read the following scenarios scenario 1. 1 factory can produce 1000 wi...
Technical Efficiency Analysis
In both scenarios, the concept of technical efficiency refers to producing the maximum output with given inputs.
- Scenario 1:
- Factory A: 1000 widgets → 200 hours of labor + 20 pounds of raw material.
- Factory B: 1000 widgets → 100 hours of labor + 20 pounds of raw material.
- Comment: Factory B is more technically efficient as it uses fewer labor hours for the same output. Thus, both factories cannot be technically efficient simultaneously since one is superior in labor usage.
- Scenario 2:
- Dressmaker A: 800 garments → 160 bolts + 3000 hours of labor.
- Dressmaker B: 800 garments → 200 bolts + 2000 hours of labor.
- Comment: Dressmaker A is more technically efficient as they use fewer bolts and less time to produce the same output. Therefore, only one can be technically efficient.
Economic Efficiency Analysis
Economic efficiency takes into account the cost of inputs in relation to the output produced.
- Scenario 1:
- Factory A: Cost = (200 hours * 50) + (20 pounds * 80) = 10000 + 1600 = 11600.
- Factory B: Cost = (100 hours * 50) + (20 pounds * 80) = 5000 + 1600 = 6600.
- Comment: Factory B is economically efficient as it has a lower cost of production for the same output. Thus, both cannot be economically efficient at the same time.
- Scenario 2:
- Dressmaker A: Cost = (160 bolts * 80) + (3000 hours * 50) = 12800 + 150000 = 162800.
- Dressmaker B: Cost = (200 bolts * 80) + (2000 hours * 50) = 16000 + 100000 = 116000.
- Comment: Dressmaker B is more economically efficient due to lower costs. Therefore, both processes cannot be economically efficient simultaneously.
Explore Courses for Humanities/Arts exam

Similar Humanities/Arts Doubts

Read the following passage carefully and answer the questions that follow:The Supreme Court ordered REL to pay ₹ 300 crore to Dahanu farmers.Our Corporate Bureau 24 March, 2005. Mumbai: The Supreme Court has ordered Reliance Energy to pay ₹ 300 crore to farmers who grow the chikoo fruit in the Dahanu area outside Mumbai. The order comes after the chikoo growers petitioned the court against the pollution caused by Reliance’s thermal power plant. Dahanu: Which is 150 km from Mumbai, was a self-sustaining agricultural and horticultural economy known for its fisheries and forests just over a decade ago, but was devastated in 1989 when a thermal power plant came into operation in the region. The next year, this fertile belt saw its first crop failure. Now, 70 percent of the crop, of what was once the fruit bowl of Maharashtra, is gone. The fisheries have been shut and the forest cover has thinned. Farmers and environmentalists say that fly ash from the power plant entered groundwater and polluted the entire ecosystem. The Dahanu Taluka Environment Protection Authority ordered the thermal station to set up a pollution control unit to reduce sulphur emissions, but in spite of a Supreme Court order backing the pollution control plant, it was not set up even by 2002. In 2003, Reliance acquired the thermal station and re-submitted a schedule for the installation process in 2004. As the pollution control plant is still not set up,the Dahanu Taluka Environmental Protection Authority asked Reliance for a bank guarantee of ` 300 crores.Q. What is the case about?

Top Courses for Humanities/Arts

Read the following scenarios scenario 1. 1 factory can produce 1000 widgets with 200 hours of labour and 20 pounds of raw material another factory can produce 1000 widget with 100 hours of labour in 20 pounds of raw material .scenario 2: A dress maker can sew 800 garments with 160 bolts of clothes and 3000 hours of labour . another dress maker can sew 800 garments for 200 bolts of clothes and 2000 hours of identical labour cloth cost rupees 80 A bolt and labour cost rs 50 an hour .for each scenario comment if is it possible for both methods to be technically efficient why or why notb. is it possible that both of these production processes are economically efficient ii?
Question Description
Read the following scenarios scenario 1. 1 factory can produce 1000 widgets with 200 hours of labour and 20 pounds of raw material another factory can produce 1000 widget with 100 hours of labour in 20 pounds of raw material .scenario 2: A dress maker can sew 800 garments with 160 bolts of clothes and 3000 hours of labour . another dress maker can sew 800 garments for 200 bolts of clothes and 2000 hours of identical labour cloth cost rupees 80 A bolt and labour cost rs 50 an hour .for each scenario comment if is it possible for both methods to be technically efficient why or why notb. is it possible that both of these production processes are economically efficient ii? for Humanities/Arts 2024 is part of Humanities/Arts preparation. The Question and answers have been prepared according to the Humanities/Arts exam syllabus. Information about Read the following scenarios scenario 1. 1 factory can produce 1000 widgets with 200 hours of labour and 20 pounds of raw material another factory can produce 1000 widget with 100 hours of labour in 20 pounds of raw material .scenario 2: A dress maker can sew 800 garments with 160 bolts of clothes and 3000 hours of labour . another dress maker can sew 800 garments for 200 bolts of clothes and 2000 hours of identical labour cloth cost rupees 80 A bolt and labour cost rs 50 an hour .for each scenario comment if is it possible for both methods to be technically efficient why or why notb. is it possible that both of these production processes are economically efficient ii? covers all topics & solutions for Humanities/Arts 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for Read the following scenarios scenario 1. 1 factory can produce 1000 widgets with 200 hours of labour and 20 pounds of raw material another factory can produce 1000 widget with 100 hours of labour in 20 pounds of raw material .scenario 2: A dress maker can sew 800 garments with 160 bolts of clothes and 3000 hours of labour . another dress maker can sew 800 garments for 200 bolts of clothes and 2000 hours of identical labour cloth cost rupees 80 A bolt and labour cost rs 50 an hour .for each scenario comment if is it possible for both methods to be technically efficient why or why notb. is it possible that both of these production processes are economically efficient ii?.
Solutions for Read the following scenarios scenario 1. 1 factory can produce 1000 widgets with 200 hours of labour and 20 pounds of raw material another factory can produce 1000 widget with 100 hours of labour in 20 pounds of raw material .scenario 2: A dress maker can sew 800 garments with 160 bolts of clothes and 3000 hours of labour . another dress maker can sew 800 garments for 200 bolts of clothes and 2000 hours of identical labour cloth cost rupees 80 A bolt and labour cost rs 50 an hour .for each scenario comment if is it possible for both methods to be technically efficient why or why notb. is it possible that both of these production processes are economically efficient ii? in English & in Hindi are available as part of our courses for Humanities/Arts. Download more important topics, notes, lectures and mock test series for Humanities/Arts Exam by signing up for free.
Here you can find the meaning of Read the following scenarios scenario 1. 1 factory can produce 1000 widgets with 200 hours of labour and 20 pounds of raw material another factory can produce 1000 widget with 100 hours of labour in 20 pounds of raw material .scenario 2: A dress maker can sew 800 garments with 160 bolts of clothes and 3000 hours of labour . another dress maker can sew 800 garments for 200 bolts of clothes and 2000 hours of identical labour cloth cost rupees 80 A bolt and labour cost rs 50 an hour .for each scenario comment if is it possible for both methods to be technically efficient why or why notb. is it possible that both of these production processes are economically efficient ii? defined & explained in the simplest way possible. Besides giving the explanation of Read the following scenarios scenario 1. 1 factory can produce 1000 widgets with 200 hours of labour and 20 pounds of raw material another factory can produce 1000 widget with 100 hours of labour in 20 pounds of raw material .scenario 2: A dress maker can sew 800 garments with 160 bolts of clothes and 3000 hours of labour . another dress maker can sew 800 garments for 200 bolts of clothes and 2000 hours of identical labour cloth cost rupees 80 A bolt and labour cost rs 50 an hour .for each scenario comment if is it possible for both methods to be technically efficient why or why notb. is it possible that both of these production processes are economically efficient ii?, a detailed solution for Read the following scenarios scenario 1. 1 factory can produce 1000 widgets with 200 hours of labour and 20 pounds of raw material another factory can produce 1000 widget with 100 hours of labour in 20 pounds of raw material .scenario 2: A dress maker can sew 800 garments with 160 bolts of clothes and 3000 hours of labour . another dress maker can sew 800 garments for 200 bolts of clothes and 2000 hours of identical labour cloth cost rupees 80 A bolt and labour cost rs 50 an hour .for each scenario comment if is it possible for both methods to be technically efficient why or why notb. is it possible that both of these production processes are economically efficient ii? has been provided alongside types of Read the following scenarios scenario 1. 1 factory can produce 1000 widgets with 200 hours of labour and 20 pounds of raw material another factory can produce 1000 widget with 100 hours of labour in 20 pounds of raw material .scenario 2: A dress maker can sew 800 garments with 160 bolts of clothes and 3000 hours of labour . another dress maker can sew 800 garments for 200 bolts of clothes and 2000 hours of identical labour cloth cost rupees 80 A bolt and labour cost rs 50 an hour .for each scenario comment if is it possible for both methods to be technically efficient why or why notb. is it possible that both of these production processes are economically efficient ii? theory, EduRev gives you an ample number of questions to practice Read the following scenarios scenario 1. 1 factory can produce 1000 widgets with 200 hours of labour and 20 pounds of raw material another factory can produce 1000 widget with 100 hours of labour in 20 pounds of raw material .scenario 2: A dress maker can sew 800 garments with 160 bolts of clothes and 3000 hours of labour . another dress maker can sew 800 garments for 200 bolts of clothes and 2000 hours of identical labour cloth cost rupees 80 A bolt and labour cost rs 50 an hour .for each scenario comment if is it possible for both methods to be technically efficient why or why notb. is it possible that both of these production processes are economically efficient ii? tests, examples and also practice Humanities/Arts tests.
Explore Courses for Humanities/Arts exam

Top Courses for Humanities/Arts

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev