Civil Engineering (CE) Exam  >  Civil Engineering (CE) Questions  >  The “distribution mains” are desi... Start Learning for Free
The “distribution mains” are designed for
  • a)
    maximum daily demand
  • b)
    maximum hourly demand
  • c)
    average daily demand
  • d)
    maximum hourly demand on “maximum day”
Correct answer is option 'D'. Can you explain this answer?
Most Upvoted Answer
The “distribution mains” are designed fora)maximum daily d...
The distribution mains are designed to meet the water demand of a particular area. The design of the distribution mains is crucial to ensure that the water supply is adequate and reliable. In this regard, the following points explain the design of the distribution mains:

Maximum Hourly Demand on Maximum Day
The distribution mains are designed to meet the maximum hourly demand on the maximum day. The maximum hourly demand refers to the peak consumption of water during a particular hour of the day. The maximum day refers to the day of the year when the water demand is the highest. The distribution mains are designed to meet the peak demand to ensure that there is adequate water supply during the peak hours.

Factors Affecting Maximum Hourly Demand
The maximum hourly demand is affected by various factors, such as the population density, the type of land use, the climatic conditions, and the time of the day. For instance, in a residential area, the peak demand may occur early in the morning when people get ready for work or school. In an industrial area, the peak demand may occur during the day when the factories are in operation.

Design Criteria
The design of the distribution mains is based on various criteria, such as the pressure requirements, the flow rate, the pipe diameter, and the pipe material. The design criteria are determined based on the peak demand and the hydraulic characteristics of the distribution system.

Conclusion
In conclusion, the distribution mains are designed to meet the maximum hourly demand on the maximum day. The design of the distribution mains is crucial to ensure that the water supply is adequate and reliable. The design criteria are based on various factors, such as the pressure requirements, the flow rate, the pipe diameter, and the pipe material.
Free Test
Community Answer
The “distribution mains” are designed fora)maximum daily d...
I think option C is correct
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

The “distribution mains” are designed fora)maximum daily demandb)maximum hourly demandc)average daily demandd)maximum hourly demand on “maximum day”Correct answer is option 'D'. Can you explain this answer?
Question Description
The “distribution mains” are designed fora)maximum daily demandb)maximum hourly demandc)average daily demandd)maximum hourly demand on “maximum day”Correct answer is option 'D'. Can you explain this answer? for Civil Engineering (CE) 2024 is part of Civil Engineering (CE) preparation. The Question and answers have been prepared according to the Civil Engineering (CE) exam syllabus. Information about The “distribution mains” are designed fora)maximum daily demandb)maximum hourly demandc)average daily demandd)maximum hourly demand on “maximum day”Correct answer is option 'D'. Can you explain this answer? covers all topics & solutions for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for The “distribution mains” are designed fora)maximum daily demandb)maximum hourly demandc)average daily demandd)maximum hourly demand on “maximum day”Correct answer is option 'D'. Can you explain this answer?.
Solutions for The “distribution mains” are designed fora)maximum daily demandb)maximum hourly demandc)average daily demandd)maximum hourly demand on “maximum day”Correct answer is option 'D'. Can you explain this answer? in English & in Hindi are available as part of our courses for Civil Engineering (CE). Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free.
Here you can find the meaning of The “distribution mains” are designed fora)maximum daily demandb)maximum hourly demandc)average daily demandd)maximum hourly demand on “maximum day”Correct answer is option 'D'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of The “distribution mains” are designed fora)maximum daily demandb)maximum hourly demandc)average daily demandd)maximum hourly demand on “maximum day”Correct answer is option 'D'. Can you explain this answer?, a detailed solution for The “distribution mains” are designed fora)maximum daily demandb)maximum hourly demandc)average daily demandd)maximum hourly demand on “maximum day”Correct answer is option 'D'. Can you explain this answer? has been provided alongside types of The “distribution mains” are designed fora)maximum daily demandb)maximum hourly demandc)average daily demandd)maximum hourly demand on “maximum day”Correct answer is option 'D'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice The “distribution mains” are designed fora)maximum daily demandb)maximum hourly demandc)average daily demandd)maximum hourly demand on “maximum day”Correct answer is option 'D'. Can you explain this answer? tests, examples and also practice Civil Engineering (CE) tests.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev