The discharge per unit drawdown at the well is known as
a)
Specific capacity
b)specific storage
c)Specific retention
d)
Specific yield
Correct answer is option 'A'. Can you explain this answer?
Most Upvoted Answer
The discharge per unit drawdown at the well is known asa)Specific capa...
Specific Capacity

Specific capacity is defined as the discharge per unit drawdown at the well. It is one of the most important parameters in groundwater hydrology and is used to determine the yield of a well.

The specific capacity of a well is determined by conducting a pumping test. During a pumping test, the well is pumped at a constant rate and the drawdown (the amount the water level drops) is measured at different times. The specific capacity is then calculated by dividing the discharge by the drawdown.

The specific capacity of a well depends on a number of factors including the geology of the aquifer, the size and depth of the well, and the pumping rate. It is an important parameter to consider when designing a well field or when evaluating the performance of an existing well.

In general, wells with high specific capacities are more productive than those with low specific capacities. However, it is important to note that the specific capacity alone does not provide a complete picture of the yield of a well. Other factors such as the well screen design and the quality of the aquifer must also be considered.

Conclusion

In conclusion, the discharge per unit drawdown at the well is known as specific capacity. It is an important parameter in groundwater hydrology and is used to determine the yield of a well. Conducting a pumping test is the best way to determine the specific capacity of a well.
Free Test
Community Answer
The discharge per unit drawdown at the well is known asa)Specific capa...
Specific capacity is rate of water released from storage of unconfined aquifer per unit draw down in aquifer
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

The discharge per unit drawdown at the well is known asa)Specific capacityb)specific storagec)Specific retentiond)Specific yieldCorrect answer is option 'A'. Can you explain this answer?
Question Description
The discharge per unit drawdown at the well is known asa)Specific capacityb)specific storagec)Specific retentiond)Specific yieldCorrect answer is option 'A'. Can you explain this answer? for Civil Engineering (CE) 2024 is part of Civil Engineering (CE) preparation. The Question and answers have been prepared according to the Civil Engineering (CE) exam syllabus. Information about The discharge per unit drawdown at the well is known asa)Specific capacityb)specific storagec)Specific retentiond)Specific yieldCorrect answer is option 'A'. Can you explain this answer? covers all topics & solutions for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for The discharge per unit drawdown at the well is known asa)Specific capacityb)specific storagec)Specific retentiond)Specific yieldCorrect answer is option 'A'. Can you explain this answer?.
Solutions for The discharge per unit drawdown at the well is known asa)Specific capacityb)specific storagec)Specific retentiond)Specific yieldCorrect answer is option 'A'. Can you explain this answer? in English & in Hindi are available as part of our courses for Civil Engineering (CE). Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free.
Here you can find the meaning of The discharge per unit drawdown at the well is known asa)Specific capacityb)specific storagec)Specific retentiond)Specific yieldCorrect answer is option 'A'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of The discharge per unit drawdown at the well is known asa)Specific capacityb)specific storagec)Specific retentiond)Specific yieldCorrect answer is option 'A'. Can you explain this answer?, a detailed solution for The discharge per unit drawdown at the well is known asa)Specific capacityb)specific storagec)Specific retentiond)Specific yieldCorrect answer is option 'A'. Can you explain this answer? has been provided alongside types of The discharge per unit drawdown at the well is known asa)Specific capacityb)specific storagec)Specific retentiond)Specific yieldCorrect answer is option 'A'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice The discharge per unit drawdown at the well is known asa)Specific capacityb)specific storagec)Specific retentiond)Specific yieldCorrect answer is option 'A'. Can you explain this answer? tests, examples and also practice Civil Engineering (CE) tests.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev