The approximate proportion of dry cement mortar required for brickwork is
  • a)
    60%
  • b)
    45%
  • c)
    30%
  • d)
    10%
Correct answer is option 'C'. Can you explain this answer?
Verified Answer
The approximate proportion of dry cement mortar required for brickwork...
Modular size of Brick is 19 cm � 9 cm � 9 cm

Size of Brick after application of Mortar = 20 cm � 10 cm � 10 cm

Volume of wet mortar can be calculated as:

V = volume of bricks with mortar – volume of bricks without mortar

V = (20 � 10 � 10) - (19 � 9 � 9) = 461 cm3 

Volume of dry cement mortar = 1.33 � 461 = 613.13 cm3 

Proportion of dry cement mortar is required for brickwork is given by, 

P = 613.13/(20 � 10 � 10) = 30.65%

For calculation of volume of cement required, we consider the volume of dry cement mortar to be 33% more than the volume of wet cement mortar.
View all questions of this test
Most Upvoted Answer
The approximate proportion of dry cement mortar required for brickwork...
The approximate proportion of dry cement mortar required for brickwork is 30%.

Explanation:

- Brickwork refers to the process of laying bricks in a systematic manner to form walls, columns, or other structures.
- Cement mortar is a mixture of cement, sand, and water used as a binding material in brickwork and other masonry works.
- The proportion of cement mortar required for brickwork depends on various factors such as the size of the bricks, the thickness of the walls, the level of the surface, etc.
- As per the standard practice in the construction industry, the proportion of cement mortar required for brickwork is generally 1:6, which means one part of cement is mixed with six parts of sand.
- This proportion of cement mortar requires approximately 30% of dry cement by volume.
- Therefore, the approximate proportion of dry cement mortar required for brickwork is 30%.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

The approximate proportion of dry cement mortar required for brickwork isa)60%b)45%c)30%d)10%Correct answer is option 'C'. Can you explain this answer?
Question Description
The approximate proportion of dry cement mortar required for brickwork isa)60%b)45%c)30%d)10%Correct answer is option 'C'. Can you explain this answer? for Civil Engineering (CE) 2024 is part of Civil Engineering (CE) preparation. The Question and answers have been prepared according to the Civil Engineering (CE) exam syllabus. Information about The approximate proportion of dry cement mortar required for brickwork isa)60%b)45%c)30%d)10%Correct answer is option 'C'. Can you explain this answer? covers all topics & solutions for Civil Engineering (CE) 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for The approximate proportion of dry cement mortar required for brickwork isa)60%b)45%c)30%d)10%Correct answer is option 'C'. Can you explain this answer?.
Solutions for The approximate proportion of dry cement mortar required for brickwork isa)60%b)45%c)30%d)10%Correct answer is option 'C'. Can you explain this answer? in English & in Hindi are available as part of our courses for Civil Engineering (CE). Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free.
Here you can find the meaning of The approximate proportion of dry cement mortar required for brickwork isa)60%b)45%c)30%d)10%Correct answer is option 'C'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of The approximate proportion of dry cement mortar required for brickwork isa)60%b)45%c)30%d)10%Correct answer is option 'C'. Can you explain this answer?, a detailed solution for The approximate proportion of dry cement mortar required for brickwork isa)60%b)45%c)30%d)10%Correct answer is option 'C'. Can you explain this answer? has been provided alongside types of The approximate proportion of dry cement mortar required for brickwork isa)60%b)45%c)30%d)10%Correct answer is option 'C'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice The approximate proportion of dry cement mortar required for brickwork isa)60%b)45%c)30%d)10%Correct answer is option 'C'. Can you explain this answer? tests, examples and also practice Civil Engineering (CE) tests.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev