The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties.  A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected party's ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.
Q. Imagine, there is a domestic commercial Contract for supply of certain goods for certain price between A and B. However, in pursuance of the same, both A and B forget to negotiate and agree on the terms of a Force Majeure event and the Contractual document does not contain the Force Majeure clause. In such a situation, what would be the fate of the Contract in the event like that of COVID 19?
  • a)
    As the parties did not negotiate on the Force Majeure Clause, either of them cannot take an exception to the Breach of Contract
  • b)
    The parties can invoke the Material Adverse Change Clause
  • c)
    In absence of such clauses in the Contract, the Courts may resort to the applicable law, i.e., the Indian Contract Act, 1872 to give relief to the parties
  • d)
    None of the above
Correct answer is option 'C'. Can you explain this answer?
Most Upvoted Answer
The COVID-19 pandemic has taken the entire world hostage in less than ...
Contract without Force Majeure Clause and Impact of COVID-19:
  1. Impact on Contract: In the absence of a Force Majeure clause in the contract between parties A and B, the situation becomes more complex when a global event like COVID-19 disrupts the performance of the contract.
  2. Legal Recourse: Without a Force Majeure clause, parties can still seek legal recourse under the Indian Contract Act, 1872. This Act provides provisions for situations where performance of a contract becomes impossible or unlawful due to unforeseen circumstances beyond the control of the parties.
  3. Doctrine of Frustration: The doctrine of frustration under the Contract Act may come into play in such situations. This doctrine applies when an unforeseen event occurs, making the performance of the contract impossible, illegal, or radically different from what was initially agreed upon.
  4. Court Intervention: In the absence of a Force Majeure clause, parties may have to approach the courts to seek relief based on the doctrine of frustration. The courts will analyze the circumstances, impact of COVID-19, and the impossibility of performance to determine the fate of the contract.
  5. Conclusion: In conclusion, in the absence of a negotiated Force Majeure clause, parties can still seek legal remedies under the Indian Contract Act, 1872. The courts will play a crucial role in interpreting and applying the law to provide relief to parties affected by unforeseen events like the COVID-19 pandemic.

Attention CLAT Students!
To make sure you are not studying endlessly, EduRev has designed CLAT study material, with Structured Courses, Videos, & Test Series. Plus get personalized analysis, doubt solving and improvement plans to achieve a great score in CLAT.
Explore Courses for CLAT exam

Similar CLAT Doubts

The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Based on the Authors argument in passage above, which of the following is correct?

The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Typically, the MAE (Material Adverse Chang e) provision in an agreement contemplates events which if they occur, or are likely occur, would have a “materially adverse change or effect on the assets, business, property, liabilities, financial condition, results, operations of the target” or that “affects the ability of the transacting parties to consummate the transaction” or the “validity or enforceability of the transacting parties to its rights and remedies under the transaction documents”. Which of the following sample clauses in a contract resembles an MAE clause?

Passage:In the 1850s, around the time the Indian Contract Act was about to be drafted, consideration was on its way to becoming a ‘mere technicality’ and could very well have ‘withered away altogether’. It should not be surprising then that framers of a midnineteenth century contract code, beginning tabula rasa, might have wished to fundamentally shake up the rules relating to consideration. Indeed, as Ibbetson argues, ‘a codifying system might legitimately have discarded consideration as inconsistent with the newly imposed legal model’ – an option ‘not open to the Common law.’ But like the ingenious common law reformers in England, the drafters continued to pay ‘lip service’ to the idea of consideration and the ‘reciprocity’ underlying it. They did indeed retain the traditional doctrine’s outer crust of reciprocity: an act or abstinence or promise on the ‘other side’, as it were, but they tweaked this in important ways. The framers of the Act, like the English Courts of the day, made it very easy to find consideration by defining it in capacious terms, which included any act or abstinence or promise, regardless of benefit or detriment. Perhaps, they too, like the Law Revision Committee, were mindful of the fact that a root and branch abolition of the doctrine might arouse ‘suspicion and hostility’ and hence decided to ‘prune away from the doctrine those aspects of it that create hardship’. They also provided that no question of adequacy of consideration could ever be raised. However, the definition under the Indian Contract Act did more than that – Section 2( d) had other elements that lent it the makings of marking the vanishing point of consideration.The definition of consideration under the Indian Contract Act, with its copula ‘at the desire of’, appears to have been calculated to preempt potential hair splitting over whether the consideration in any given case was indeed valuable in the ‘eye of the law’. The idea at play here is that of the subjective theory of value: that the Courts would not second-guess whether any consideration was actually valuable – what the promisor desired is what he got and that settled conclusively the matter of the value of consideration. This was one of the effects of the influence of the will theory on the traditional exchange model of consideration.Q.Which of these is true?

Top Courses for CLAT

The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Imagine, there is a domestic commercial Contract for supply of certain goods for certain price between A and B. However, in pursuance of the same, both A and B forget to negotiate and agree on the terms of a Force Majeure event and the Contractual document does not contain the Force Majeure clause. In such a situation, what would be the fate of the Contract in the event like that of COVID 19?a)As the parties did not negotiate on the Force Majeure Clause, either of them cannot take an exception to the Breach of Contractb)The parties can invoke the Material Adverse Change Clausec)In absence of such clauses in the Contract, the Courts may resort to the applicable law, i.e., the Indian Contract Act, 1872 to give relief to the partiesd)None of the aboveCorrect answer is option 'C'. Can you explain this answer?
Question Description
The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Imagine, there is a domestic commercial Contract for supply of certain goods for certain price between A and B. However, in pursuance of the same, both A and B forget to negotiate and agree on the terms of a Force Majeure event and the Contractual document does not contain the Force Majeure clause. In such a situation, what would be the fate of the Contract in the event like that of COVID 19?a)As the parties did not negotiate on the Force Majeure Clause, either of them cannot take an exception to the Breach of Contractb)The parties can invoke the Material Adverse Change Clausec)In absence of such clauses in the Contract, the Courts may resort to the applicable law, i.e., the Indian Contract Act, 1872 to give relief to the partiesd)None of the aboveCorrect answer is option 'C'. Can you explain this answer? for CLAT 2024 is part of CLAT preparation. The Question and answers have been prepared according to the CLAT exam syllabus. Information about The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Imagine, there is a domestic commercial Contract for supply of certain goods for certain price between A and B. However, in pursuance of the same, both A and B forget to negotiate and agree on the terms of a Force Majeure event and the Contractual document does not contain the Force Majeure clause. In such a situation, what would be the fate of the Contract in the event like that of COVID 19?a)As the parties did not negotiate on the Force Majeure Clause, either of them cannot take an exception to the Breach of Contractb)The parties can invoke the Material Adverse Change Clausec)In absence of such clauses in the Contract, the Courts may resort to the applicable law, i.e., the Indian Contract Act, 1872 to give relief to the partiesd)None of the aboveCorrect answer is option 'C'. Can you explain this answer? covers all topics & solutions for CLAT 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Imagine, there is a domestic commercial Contract for supply of certain goods for certain price between A and B. However, in pursuance of the same, both A and B forget to negotiate and agree on the terms of a Force Majeure event and the Contractual document does not contain the Force Majeure clause. In such a situation, what would be the fate of the Contract in the event like that of COVID 19?a)As the parties did not negotiate on the Force Majeure Clause, either of them cannot take an exception to the Breach of Contractb)The parties can invoke the Material Adverse Change Clausec)In absence of such clauses in the Contract, the Courts may resort to the applicable law, i.e., the Indian Contract Act, 1872 to give relief to the partiesd)None of the aboveCorrect answer is option 'C'. Can you explain this answer?.
Solutions for The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Imagine, there is a domestic commercial Contract for supply of certain goods for certain price between A and B. However, in pursuance of the same, both A and B forget to negotiate and agree on the terms of a Force Majeure event and the Contractual document does not contain the Force Majeure clause. In such a situation, what would be the fate of the Contract in the event like that of COVID 19?a)As the parties did not negotiate on the Force Majeure Clause, either of them cannot take an exception to the Breach of Contractb)The parties can invoke the Material Adverse Change Clausec)In absence of such clauses in the Contract, the Courts may resort to the applicable law, i.e., the Indian Contract Act, 1872 to give relief to the partiesd)None of the aboveCorrect answer is option 'C'. Can you explain this answer? in English & in Hindi are available as part of our courses for CLAT. Download more important topics, notes, lectures and mock test series for CLAT Exam by signing up for free.
Here you can find the meaning of The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Imagine, there is a domestic commercial Contract for supply of certain goods for certain price between A and B. However, in pursuance of the same, both A and B forget to negotiate and agree on the terms of a Force Majeure event and the Contractual document does not contain the Force Majeure clause. In such a situation, what would be the fate of the Contract in the event like that of COVID 19?a)As the parties did not negotiate on the Force Majeure Clause, either of them cannot take an exception to the Breach of Contractb)The parties can invoke the Material Adverse Change Clausec)In absence of such clauses in the Contract, the Courts may resort to the applicable law, i.e., the Indian Contract Act, 1872 to give relief to the partiesd)None of the aboveCorrect answer is option 'C'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Imagine, there is a domestic commercial Contract for supply of certain goods for certain price between A and B. However, in pursuance of the same, both A and B forget to negotiate and agree on the terms of a Force Majeure event and the Contractual document does not contain the Force Majeure clause. In such a situation, what would be the fate of the Contract in the event like that of COVID 19?a)As the parties did not negotiate on the Force Majeure Clause, either of them cannot take an exception to the Breach of Contractb)The parties can invoke the Material Adverse Change Clausec)In absence of such clauses in the Contract, the Courts may resort to the applicable law, i.e., the Indian Contract Act, 1872 to give relief to the partiesd)None of the aboveCorrect answer is option 'C'. Can you explain this answer?, a detailed solution for The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Imagine, there is a domestic commercial Contract for supply of certain goods for certain price between A and B. However, in pursuance of the same, both A and B forget to negotiate and agree on the terms of a Force Majeure event and the Contractual document does not contain the Force Majeure clause. In such a situation, what would be the fate of the Contract in the event like that of COVID 19?a)As the parties did not negotiate on the Force Majeure Clause, either of them cannot take an exception to the Breach of Contractb)The parties can invoke the Material Adverse Change Clausec)In absence of such clauses in the Contract, the Courts may resort to the applicable law, i.e., the Indian Contract Act, 1872 to give relief to the partiesd)None of the aboveCorrect answer is option 'C'. Can you explain this answer? has been provided alongside types of The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Imagine, there is a domestic commercial Contract for supply of certain goods for certain price between A and B. However, in pursuance of the same, both A and B forget to negotiate and agree on the terms of a Force Majeure event and the Contractual document does not contain the Force Majeure clause. In such a situation, what would be the fate of the Contract in the event like that of COVID 19?a)As the parties did not negotiate on the Force Majeure Clause, either of them cannot take an exception to the Breach of Contractb)The parties can invoke the Material Adverse Change Clausec)In absence of such clauses in the Contract, the Courts may resort to the applicable law, i.e., the Indian Contract Act, 1872 to give relief to the partiesd)None of the aboveCorrect answer is option 'C'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice The COVID-19 pandemic has taken the entire world hostage in less than four months, and the global economy has been hit the hardest with governments across the globe implementing stringent policies including lockdown to control the coronavirus outbreak. The pandemic today presents unprecedented challenges and impediments to businesses in conducting their normal operations. The lockdown across the world has caused delays in the performance of contracts and transactions. Now, the question that arises is whether the current situation can enable parties to a contract to alter their obligations with non-compliance of terms neither being regarded as a "default committed by any party" nor a "breach of contract"? There are certain well-accepted practices for dealing with such extraordinary situations in commercial transactions by the inclusion of force majeure & material adverse effect (MAE) clauses. Determination of the types of circumstances so covered by the force majeure clause contained in a contract is essential. Provisions of force majeure often cover natural disasters like hurricanes, floods, and earthquakes as "acts of God." Other covered events may include war, terrorism, civil disorder, fire, disease medical epidemics or by reasons of applicable laws or regulations. Broadly, the Courts have interpreted the term "Force Majeure" as an event that can neither be anticipated nor controlled by either of the contracting parties. A force majeure clause applies in the context of ongoing contractual arrangements, whereas, an MAE or material adverse change (MAC) clause applies to the allocation of risk in transactions before their closure or completion. Pandemic and related consequences such as government action is a type of event covered by a force majeure clause, however, its impact on the affected partys ability to perform its contractual obligations may vary depending upon contractual terms. It is common for force majeure clauses to specify the impact that the event or circumstances in question must have, in order for the clause to be triggered. References may be made, for example, to the event or circumstances having "prevented", "hindered" or "delayed" performance. These terms require different levels of impact on performance before a party can claim recourse to these clauses. In other words, the force majeure and MAC clauses act as an exception to what would otherwise be treated as a breach of contract. Certain contracts may state that, if a force majeure clause is applied, the contract may automatically be terminated. On the other hand, some contracts may even state that the duty to fulfil the contractual obligation may be suspended for a certain period of time and if the force majeure event is not curbed or treated even after such time, then eventually the contract may be terminated. Though there cannot be a one-size-fits-all solution to this question, and it depends upon how the force majeure clause is worded in a specific contract; and in the absence of the same, applicable laws related to the same will be required to be taken into consideration.Q.Imagine, there is a domestic commercial Contract for supply of certain goods for certain price between A and B. However, in pursuance of the same, both A and B forget to negotiate and agree on the terms of a Force Majeure event and the Contractual document does not contain the Force Majeure clause. In such a situation, what would be the fate of the Contract in the event like that of COVID 19?a)As the parties did not negotiate on the Force Majeure Clause, either of them cannot take an exception to the Breach of Contractb)The parties can invoke the Material Adverse Change Clausec)In absence of such clauses in the Contract, the Courts may resort to the applicable law, i.e., the Indian Contract Act, 1872 to give relief to the partiesd)None of the aboveCorrect answer is option 'C'. Can you explain this answer? tests, examples and also practice CLAT tests.
Explore Courses for CLAT exam

Top Courses for CLAT

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev