CLAT Exam  >  CLAT Questions  >   Pakistan raised objections to the designs of... Start Learning for Free
Pakistan raised objections to the designs of Pakal Dul and Lower Kalnai hydropower plants in Jammu and Kashmir and sought more information on the projects in Ladakh sanctioned after the abrogation of Article 370 as the [X]Commissioners of the two countries met here on Tuesday, sources said. On its part, India justified its stand on the designs.
The Pakal Dul Hydro Electric Project (1,000 MW) is proposed on the Marusudar river, a tributary of the [...] river, in Kishtwar district in Jammu and Kashmir. The Lower Kalnai project is proposed in Kishtwar and Doda districts. The two sides also discussed a host of other issues under the [X] during the annual Permanent Indus Commission meeting.
The two-day meeting which started on Tuesday is taking place after a gap of over two years. The last meeting took place in Lahore in August 2018. The Indian delegation was led by P K Saxena, India's Commissioner, and his team from the Central Water Commission, the Central Electricity Authority and the National Hydroelectric Power Corporation.
The Pakistani delegation was led by its Commissioner Syed Muhammad Meher Ali Shah. The delegation arrived here on Monday evening. This year's meeting is the first between the two commissioners after the August 2019 nullification of the provisions of Article 370 of the Constitution that gave special status to the state of Jammu and Kashmir.
Q. Which of the following Hydroelectric project was collapsed due to glacier burst recently?
  • a)
    Rishiganga Hydroelectric Project
  • b)
    Tapovan Hydroelectric Project
  • c)
    Yamuna Hydroelectric Project
  • d)
    Alaknanda hydroelectric project
Correct answer is option 'A'. Can you explain this answer?
Verified Answer
Pakistan raised objections to the designs of Pakal Dul and Lower Kaln...
Uttarakhand police said the avalanche struck at about 11:00 local time (05:30 GMT), destroying a dam known as the Rishiganga Hydroelectric Project. The impact catapulted water along the Dhauliganga river, damaging another power project downstream in the Tapovan area.
View all questions of this test
Explore Courses for CLAT exam

Similar CLAT Doubts

Read the following passage and answer the question as directed.Sanjay Kothari, the Secretary to the President, has been selected as the new {X} by a high-powered committee headed by Prime Minister Narendra Modi, an official said.Committee has also chosen former Information and Broadcasting Secretary Bimal Julka, currently serving as an Information Commissioner, as the new Chief Information Commissioner in the Central Information Commission.Sources said the recommendation for the appointment of Kothari and Julka, who are retired Indian Administrative Service (IAS) officers, by a majority decision was opposed by Congress leader in the Lok Sabha Adhir Ranjan Chowdhury. The selection panel also included Union Home Minister Amit Shah."Kothari and Julka have been selected as the next {X} and CIC," said a senior government official, who did not want to be named.The three-member panel also decided by majority the appointment of Suresh Patel as Vigilance Commissioner and Anita Pandove as Information Commissioner.Congress spokesperson Manish Tewari said government should initiate a fresh process for appointing the next {X} by inviting applications again."We demand that the entire process be scrapped in its entirety and a de novo process started by inviting applications afresh. There needs to be proper application of mind," he told reporters.Manish Tewari claimed that it is clear that government has a lot to hide and wants the {X} to be a "rubber stamp".Congress chief spokesperson Randeep Surjewala also attacked government over the appointment of {X} and CIC and alleged there is no place for transparency, accountability and constitutional processes in Prime Minister Narendra Modis New India, which was fatal for democracy.He alleged that the appointments of {X} and CIC are being made arbitrarily on the lines of "khul ja sim sim" (open sesam e)."Arbitrariness in top judicial institutions is fatal for democracy," he said."The appointments of {X} and CIC are being made on the lines of open sesame. Bring out names from the pocket and make appointments, thats it. There is no place left for transparency, accountability, constitutional processes and compliance of law in Modi jis New India," he charged on Twitter.It is free of control from any executive authority and has the responsibility of monitoring all vigilance activities in the Central Government, besides advising various authorities in planning, executing, reviewing and reforming their vigilance work.The Central Information Commission was constituted under the {Y} Act and has the jurisdiction over all central public authorities.Q.What should be the maximum gap between two parliamentary sessions?

Top Courses for CLAT

Pakistan raised objections to the designs of Pakal Dul and Lower Kalnai hydropower plants in Jammu and Kashmir and sought more information on the projects in Ladakh sanctioned after the abrogation of Article 370 as the [X]Commissioners of the two countries met here on Tuesday, sources said. On its part, India justified its stand on the designs.The Pakal Dul Hydro Electric Project (1,000 MW) is proposed on the Marusudar river, a tributary of the [...] river, in Kishtwar district in Jammu and Kashmir. The Lower Kalnai project is proposed in Kishtwar and Doda districts. The two sides also discussed a host of other issues under the [X] during the annual Permanent Indus Commission meeting.The two-day meeting which started on Tuesday is taking place after a gap of over two years. The last meeting took place in Lahore in August 2018. The Indian delegation was led by P K Saxena, India's Commissioner, and his team from the Central Water Commission, the Central Electricity Authority and the National Hydroelectric Power Corporation.The Pakistani delegation was led by its Commissioner Syed Muhammad Meher Ali Shah. The delegation arrived here on Monday evening. This year's meeting is the first between the two commissioners after the August 2019 nullification of the provisions of Article 370 of the Constitution that gave special status to the state of Jammu and Kashmir.Q. Which of the following Hydroelectric project was collapsed due to glacier burst recently?a)Rishiganga Hydroelectric Projectb)Tapovan Hydroelectric Projectc)Yamuna Hydroelectric Projectd)Alaknanda hydroelectric projectCorrect answer is option 'A'. Can you explain this answer?
Question Description
Pakistan raised objections to the designs of Pakal Dul and Lower Kalnai hydropower plants in Jammu and Kashmir and sought more information on the projects in Ladakh sanctioned after the abrogation of Article 370 as the [X]Commissioners of the two countries met here on Tuesday, sources said. On its part, India justified its stand on the designs.The Pakal Dul Hydro Electric Project (1,000 MW) is proposed on the Marusudar river, a tributary of the [...] river, in Kishtwar district in Jammu and Kashmir. The Lower Kalnai project is proposed in Kishtwar and Doda districts. The two sides also discussed a host of other issues under the [X] during the annual Permanent Indus Commission meeting.The two-day meeting which started on Tuesday is taking place after a gap of over two years. The last meeting took place in Lahore in August 2018. The Indian delegation was led by P K Saxena, India's Commissioner, and his team from the Central Water Commission, the Central Electricity Authority and the National Hydroelectric Power Corporation.The Pakistani delegation was led by its Commissioner Syed Muhammad Meher Ali Shah. The delegation arrived here on Monday evening. This year's meeting is the first between the two commissioners after the August 2019 nullification of the provisions of Article 370 of the Constitution that gave special status to the state of Jammu and Kashmir.Q. Which of the following Hydroelectric project was collapsed due to glacier burst recently?a)Rishiganga Hydroelectric Projectb)Tapovan Hydroelectric Projectc)Yamuna Hydroelectric Projectd)Alaknanda hydroelectric projectCorrect answer is option 'A'. Can you explain this answer? for CLAT 2024 is part of CLAT preparation. The Question and answers have been prepared according to the CLAT exam syllabus. Information about Pakistan raised objections to the designs of Pakal Dul and Lower Kalnai hydropower plants in Jammu and Kashmir and sought more information on the projects in Ladakh sanctioned after the abrogation of Article 370 as the [X]Commissioners of the two countries met here on Tuesday, sources said. On its part, India justified its stand on the designs.The Pakal Dul Hydro Electric Project (1,000 MW) is proposed on the Marusudar river, a tributary of the [...] river, in Kishtwar district in Jammu and Kashmir. The Lower Kalnai project is proposed in Kishtwar and Doda districts. The two sides also discussed a host of other issues under the [X] during the annual Permanent Indus Commission meeting.The two-day meeting which started on Tuesday is taking place after a gap of over two years. The last meeting took place in Lahore in August 2018. The Indian delegation was led by P K Saxena, India's Commissioner, and his team from the Central Water Commission, the Central Electricity Authority and the National Hydroelectric Power Corporation.The Pakistani delegation was led by its Commissioner Syed Muhammad Meher Ali Shah. The delegation arrived here on Monday evening. This year's meeting is the first between the two commissioners after the August 2019 nullification of the provisions of Article 370 of the Constitution that gave special status to the state of Jammu and Kashmir.Q. Which of the following Hydroelectric project was collapsed due to glacier burst recently?a)Rishiganga Hydroelectric Projectb)Tapovan Hydroelectric Projectc)Yamuna Hydroelectric Projectd)Alaknanda hydroelectric projectCorrect answer is option 'A'. Can you explain this answer? covers all topics & solutions for CLAT 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for Pakistan raised objections to the designs of Pakal Dul and Lower Kalnai hydropower plants in Jammu and Kashmir and sought more information on the projects in Ladakh sanctioned after the abrogation of Article 370 as the [X]Commissioners of the two countries met here on Tuesday, sources said. On its part, India justified its stand on the designs.The Pakal Dul Hydro Electric Project (1,000 MW) is proposed on the Marusudar river, a tributary of the [...] river, in Kishtwar district in Jammu and Kashmir. The Lower Kalnai project is proposed in Kishtwar and Doda districts. The two sides also discussed a host of other issues under the [X] during the annual Permanent Indus Commission meeting.The two-day meeting which started on Tuesday is taking place after a gap of over two years. The last meeting took place in Lahore in August 2018. The Indian delegation was led by P K Saxena, India's Commissioner, and his team from the Central Water Commission, the Central Electricity Authority and the National Hydroelectric Power Corporation.The Pakistani delegation was led by its Commissioner Syed Muhammad Meher Ali Shah. The delegation arrived here on Monday evening. This year's meeting is the first between the two commissioners after the August 2019 nullification of the provisions of Article 370 of the Constitution that gave special status to the state of Jammu and Kashmir.Q. Which of the following Hydroelectric project was collapsed due to glacier burst recently?a)Rishiganga Hydroelectric Projectb)Tapovan Hydroelectric Projectc)Yamuna Hydroelectric Projectd)Alaknanda hydroelectric projectCorrect answer is option 'A'. Can you explain this answer?.
Solutions for Pakistan raised objections to the designs of Pakal Dul and Lower Kalnai hydropower plants in Jammu and Kashmir and sought more information on the projects in Ladakh sanctioned after the abrogation of Article 370 as the [X]Commissioners of the two countries met here on Tuesday, sources said. On its part, India justified its stand on the designs.The Pakal Dul Hydro Electric Project (1,000 MW) is proposed on the Marusudar river, a tributary of the [...] river, in Kishtwar district in Jammu and Kashmir. The Lower Kalnai project is proposed in Kishtwar and Doda districts. The two sides also discussed a host of other issues under the [X] during the annual Permanent Indus Commission meeting.The two-day meeting which started on Tuesday is taking place after a gap of over two years. The last meeting took place in Lahore in August 2018. The Indian delegation was led by P K Saxena, India's Commissioner, and his team from the Central Water Commission, the Central Electricity Authority and the National Hydroelectric Power Corporation.The Pakistani delegation was led by its Commissioner Syed Muhammad Meher Ali Shah. The delegation arrived here on Monday evening. This year's meeting is the first between the two commissioners after the August 2019 nullification of the provisions of Article 370 of the Constitution that gave special status to the state of Jammu and Kashmir.Q. Which of the following Hydroelectric project was collapsed due to glacier burst recently?a)Rishiganga Hydroelectric Projectb)Tapovan Hydroelectric Projectc)Yamuna Hydroelectric Projectd)Alaknanda hydroelectric projectCorrect answer is option 'A'. Can you explain this answer? in English & in Hindi are available as part of our courses for CLAT. Download more important topics, notes, lectures and mock test series for CLAT Exam by signing up for free.
Here you can find the meaning of Pakistan raised objections to the designs of Pakal Dul and Lower Kalnai hydropower plants in Jammu and Kashmir and sought more information on the projects in Ladakh sanctioned after the abrogation of Article 370 as the [X]Commissioners of the two countries met here on Tuesday, sources said. On its part, India justified its stand on the designs.The Pakal Dul Hydro Electric Project (1,000 MW) is proposed on the Marusudar river, a tributary of the [...] river, in Kishtwar district in Jammu and Kashmir. The Lower Kalnai project is proposed in Kishtwar and Doda districts. The two sides also discussed a host of other issues under the [X] during the annual Permanent Indus Commission meeting.The two-day meeting which started on Tuesday is taking place after a gap of over two years. The last meeting took place in Lahore in August 2018. The Indian delegation was led by P K Saxena, India's Commissioner, and his team from the Central Water Commission, the Central Electricity Authority and the National Hydroelectric Power Corporation.The Pakistani delegation was led by its Commissioner Syed Muhammad Meher Ali Shah. The delegation arrived here on Monday evening. This year's meeting is the first between the two commissioners after the August 2019 nullification of the provisions of Article 370 of the Constitution that gave special status to the state of Jammu and Kashmir.Q. Which of the following Hydroelectric project was collapsed due to glacier burst recently?a)Rishiganga Hydroelectric Projectb)Tapovan Hydroelectric Projectc)Yamuna Hydroelectric Projectd)Alaknanda hydroelectric projectCorrect answer is option 'A'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of Pakistan raised objections to the designs of Pakal Dul and Lower Kalnai hydropower plants in Jammu and Kashmir and sought more information on the projects in Ladakh sanctioned after the abrogation of Article 370 as the [X]Commissioners of the two countries met here on Tuesday, sources said. On its part, India justified its stand on the designs.The Pakal Dul Hydro Electric Project (1,000 MW) is proposed on the Marusudar river, a tributary of the [...] river, in Kishtwar district in Jammu and Kashmir. The Lower Kalnai project is proposed in Kishtwar and Doda districts. The two sides also discussed a host of other issues under the [X] during the annual Permanent Indus Commission meeting.The two-day meeting which started on Tuesday is taking place after a gap of over two years. The last meeting took place in Lahore in August 2018. The Indian delegation was led by P K Saxena, India's Commissioner, and his team from the Central Water Commission, the Central Electricity Authority and the National Hydroelectric Power Corporation.The Pakistani delegation was led by its Commissioner Syed Muhammad Meher Ali Shah. The delegation arrived here on Monday evening. This year's meeting is the first between the two commissioners after the August 2019 nullification of the provisions of Article 370 of the Constitution that gave special status to the state of Jammu and Kashmir.Q. Which of the following Hydroelectric project was collapsed due to glacier burst recently?a)Rishiganga Hydroelectric Projectb)Tapovan Hydroelectric Projectc)Yamuna Hydroelectric Projectd)Alaknanda hydroelectric projectCorrect answer is option 'A'. Can you explain this answer?, a detailed solution for Pakistan raised objections to the designs of Pakal Dul and Lower Kalnai hydropower plants in Jammu and Kashmir and sought more information on the projects in Ladakh sanctioned after the abrogation of Article 370 as the [X]Commissioners of the two countries met here on Tuesday, sources said. On its part, India justified its stand on the designs.The Pakal Dul Hydro Electric Project (1,000 MW) is proposed on the Marusudar river, a tributary of the [...] river, in Kishtwar district in Jammu and Kashmir. The Lower Kalnai project is proposed in Kishtwar and Doda districts. The two sides also discussed a host of other issues under the [X] during the annual Permanent Indus Commission meeting.The two-day meeting which started on Tuesday is taking place after a gap of over two years. The last meeting took place in Lahore in August 2018. The Indian delegation was led by P K Saxena, India's Commissioner, and his team from the Central Water Commission, the Central Electricity Authority and the National Hydroelectric Power Corporation.The Pakistani delegation was led by its Commissioner Syed Muhammad Meher Ali Shah. The delegation arrived here on Monday evening. This year's meeting is the first between the two commissioners after the August 2019 nullification of the provisions of Article 370 of the Constitution that gave special status to the state of Jammu and Kashmir.Q. Which of the following Hydroelectric project was collapsed due to glacier burst recently?a)Rishiganga Hydroelectric Projectb)Tapovan Hydroelectric Projectc)Yamuna Hydroelectric Projectd)Alaknanda hydroelectric projectCorrect answer is option 'A'. Can you explain this answer? has been provided alongside types of Pakistan raised objections to the designs of Pakal Dul and Lower Kalnai hydropower plants in Jammu and Kashmir and sought more information on the projects in Ladakh sanctioned after the abrogation of Article 370 as the [X]Commissioners of the two countries met here on Tuesday, sources said. On its part, India justified its stand on the designs.The Pakal Dul Hydro Electric Project (1,000 MW) is proposed on the Marusudar river, a tributary of the [...] river, in Kishtwar district in Jammu and Kashmir. The Lower Kalnai project is proposed in Kishtwar and Doda districts. The two sides also discussed a host of other issues under the [X] during the annual Permanent Indus Commission meeting.The two-day meeting which started on Tuesday is taking place after a gap of over two years. The last meeting took place in Lahore in August 2018. The Indian delegation was led by P K Saxena, India's Commissioner, and his team from the Central Water Commission, the Central Electricity Authority and the National Hydroelectric Power Corporation.The Pakistani delegation was led by its Commissioner Syed Muhammad Meher Ali Shah. The delegation arrived here on Monday evening. This year's meeting is the first between the two commissioners after the August 2019 nullification of the provisions of Article 370 of the Constitution that gave special status to the state of Jammu and Kashmir.Q. Which of the following Hydroelectric project was collapsed due to glacier burst recently?a)Rishiganga Hydroelectric Projectb)Tapovan Hydroelectric Projectc)Yamuna Hydroelectric Projectd)Alaknanda hydroelectric projectCorrect answer is option 'A'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice Pakistan raised objections to the designs of Pakal Dul and Lower Kalnai hydropower plants in Jammu and Kashmir and sought more information on the projects in Ladakh sanctioned after the abrogation of Article 370 as the [X]Commissioners of the two countries met here on Tuesday, sources said. On its part, India justified its stand on the designs.The Pakal Dul Hydro Electric Project (1,000 MW) is proposed on the Marusudar river, a tributary of the [...] river, in Kishtwar district in Jammu and Kashmir. The Lower Kalnai project is proposed in Kishtwar and Doda districts. The two sides also discussed a host of other issues under the [X] during the annual Permanent Indus Commission meeting.The two-day meeting which started on Tuesday is taking place after a gap of over two years. The last meeting took place in Lahore in August 2018. The Indian delegation was led by P K Saxena, India's Commissioner, and his team from the Central Water Commission, the Central Electricity Authority and the National Hydroelectric Power Corporation.The Pakistani delegation was led by its Commissioner Syed Muhammad Meher Ali Shah. The delegation arrived here on Monday evening. This year's meeting is the first between the two commissioners after the August 2019 nullification of the provisions of Article 370 of the Constitution that gave special status to the state of Jammu and Kashmir.Q. Which of the following Hydroelectric project was collapsed due to glacier burst recently?a)Rishiganga Hydroelectric Projectb)Tapovan Hydroelectric Projectc)Yamuna Hydroelectric Projectd)Alaknanda hydroelectric projectCorrect answer is option 'A'. Can you explain this answer? tests, examples and also practice CLAT tests.
Explore Courses for CLAT exam

Top Courses for CLAT

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev