Cost in situ concrete piles are not suitable for:



  • Underwater purposes: Cost in situ concrete piles are not suitable for constructing foundations in water bodies such as rivers, lakes, or oceans. This is because the process of installing these piles involves drilling a hole in the ground and then filling it with concrete. Such a process is not practical underwater, as it is difficult to drill and fill the hole with concrete while the water is constantly flowing. Instead, other types of piles such as steel piles or precast concrete piles are more suitable for underwater purposes.


  • Within city: Cost in situ concrete piles are not suitable for urban areas where space is limited. This is because the process of installing these piles requires heavy machinery and equipment to drill the hole and pour the concrete. The process can be noisy and disruptive to the surrounding environment, which can be a problem in densely populated areas. Additionally, the process can cause damage to nearby buildings and structures, making it unsuitable for urban areas.


  • Lightweight casing shell: Cost in situ concrete piles are not suitable for lightweight casing shells. This is because the process of installing these piles involves drilling a hole into the ground, and then filling it with concrete. The weight of the concrete can cause the lightweight casing shell to collapse, rendering the pile ineffective. Instead, other types of piles such as steel piles or timber piles are more suitable for lightweight casing shells.


  • On river banks: Cost in situ concrete piles are not suitable for constructing foundations on river banks or other areas with soft soil. This is because the process of installing these piles involves drilling a hole into the ground, and then filling it with concrete. The weight of the concrete can cause the surrounding soil to compress, which can lead to settlement and instability. Instead, other types of piles such as steel piles or timber piles are more suitable for soft soil conditions.



In summary, while cost in situ concrete piles are a popular choice for foundation construction, they are not suitable for all situations. It is important to consider factors such as the surrounding environment, soil conditions, and the weight of the building or structure when choosing the type of pile to use.
Community Answer
Cost in situ concrete piles are not suitable for (1) Under water purpo...
2
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Cost in situ concrete piles are not suitable for (1) Under water purposes (2) With in city (3) Light weight casing shell (4) On river banks?
Question Description
Cost in situ concrete piles are not suitable for (1) Under water purposes (2) With in city (3) Light weight casing shell (4) On river banks? for Civil Engineering (CE) 2025 is part of Civil Engineering (CE) preparation. The Question and answers have been prepared according to the Civil Engineering (CE) exam syllabus. Information about Cost in situ concrete piles are not suitable for (1) Under water purposes (2) With in city (3) Light weight casing shell (4) On river banks? covers all topics & solutions for Civil Engineering (CE) 2025 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for Cost in situ concrete piles are not suitable for (1) Under water purposes (2) With in city (3) Light weight casing shell (4) On river banks?.
Solutions for Cost in situ concrete piles are not suitable for (1) Under water purposes (2) With in city (3) Light weight casing shell (4) On river banks? in English & in Hindi are available as part of our courses for Civil Engineering (CE). Download more important topics, notes, lectures and mock test series for Civil Engineering (CE) Exam by signing up for free.
Here you can find the meaning of Cost in situ concrete piles are not suitable for (1) Under water purposes (2) With in city (3) Light weight casing shell (4) On river banks? defined & explained in the simplest way possible. Besides giving the explanation of Cost in situ concrete piles are not suitable for (1) Under water purposes (2) With in city (3) Light weight casing shell (4) On river banks?, a detailed solution for Cost in situ concrete piles are not suitable for (1) Under water purposes (2) With in city (3) Light weight casing shell (4) On river banks? has been provided alongside types of Cost in situ concrete piles are not suitable for (1) Under water purposes (2) With in city (3) Light weight casing shell (4) On river banks? theory, EduRev gives you an ample number of questions to practice Cost in situ concrete piles are not suitable for (1) Under water purposes (2) With in city (3) Light weight casing shell (4) On river banks? tests, examples and also practice Civil Engineering (CE) tests.
Explore Courses for Civil Engineering (CE) exam

Top Courses for Civil Engineering (CE)

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev