Directions: Read the passage and answer the question that follows.
The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.
[Source - www.business-standard.com, September 20, 2022]
Q. Consider the following statements and mark the correct option.
Statement I: The objective of the India-Bangladesh Friendship Pipeline Project (IBFPP) is to establish a connection between Siliguri in West Bengal, India, and Parbatipur in the Dinajpur district of Bangladesh.
Statement II: The project is a collaborative effort undertaken by India's Numaligarh Refinery Limited and Bangladesh's Meghna Petroleum Limited.
  • a)
    Only statement I is correct.
  • b)
    Only statement II is correct.
  • c)
    Both statements are correct.
  • d)
    Both statements are incorrect.
Correct answer is option 'C'. Can you explain this answer?
Most Upvoted Answer
Directions: Read the passage and answer the question that follows.The ...
The India-Bangladesh Friendship Pipeline Project (IBFPP) proposes to link Parbatipur in Bangladesh's Dinajpur district with Siliguri in West Bengal, India. This project cost a total of Rs. 346 crore to complete. This 130 km pipeline, now under construction, will have a 1 million metric ton annual capacity. The Bangladeshi Meghna Petroleum Limited and the Indian Numaligarh Refinery Limited are working together to complete the project.
Explore Courses for CLAT exam

Similar CLAT Doubts

Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q. Consider the following statements and mark the correct option.Statement I: The India-Bangladesh Friendship Pipeline Project (IBFPP) aims to connect Siliguri in West Bengal, India with Parbatipur in Bangladesh's Dinajpur district.Statement II: The project is jointly implemented by the Numaligarh Refinery Limited of India and Meghna Petroleum Limited of Bangladesh.

Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q.In 2022, the Maitree Super Thermal Power Project will be officially inaugurated by Prime Minister Modi and Prime Minister Sheikh Hasina of Bangladesh. For Bangladesh-India Friendship Power Company Private Limited, which of the following businesses built this project?

Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targeted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q. PM Modi and Bangladesh's Prime Minister Sheikh Hasina have jointly unveiled the Maitree Super Thermal Power Project in 2022. Which of the following companies has developed this project for Bangladesh-India Friendship Power Company Private Limited?

Top Courses for CLAT

Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q.Consider the following statements and mark the correct option.Statement I: The objective of the India-Bangladesh Friendship Pipeline Project (IBFPP) is to establish a connection between Siliguri in West Bengal, India, and Parbatipur in the Dinajpur district of Bangladesh.Statement II: The project is a collaborative effort undertaken by Indias Numaligarh Refinery Limited and Bangladeshs Meghna Petroleum Limited.a)Only statement I is correct.b)Only statement II is correct.c)Both statements are correct.d)Both statements are incorrect.Correct answer is option 'C'. Can you explain this answer?
Question Description
Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q.Consider the following statements and mark the correct option.Statement I: The objective of the India-Bangladesh Friendship Pipeline Project (IBFPP) is to establish a connection between Siliguri in West Bengal, India, and Parbatipur in the Dinajpur district of Bangladesh.Statement II: The project is a collaborative effort undertaken by Indias Numaligarh Refinery Limited and Bangladeshs Meghna Petroleum Limited.a)Only statement I is correct.b)Only statement II is correct.c)Both statements are correct.d)Both statements are incorrect.Correct answer is option 'C'. Can you explain this answer? for CLAT 2025 is part of CLAT preparation. The Question and answers have been prepared according to the CLAT exam syllabus. Information about Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q.Consider the following statements and mark the correct option.Statement I: The objective of the India-Bangladesh Friendship Pipeline Project (IBFPP) is to establish a connection between Siliguri in West Bengal, India, and Parbatipur in the Dinajpur district of Bangladesh.Statement II: The project is a collaborative effort undertaken by Indias Numaligarh Refinery Limited and Bangladeshs Meghna Petroleum Limited.a)Only statement I is correct.b)Only statement II is correct.c)Both statements are correct.d)Both statements are incorrect.Correct answer is option 'C'. Can you explain this answer? covers all topics & solutions for CLAT 2025 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q.Consider the following statements and mark the correct option.Statement I: The objective of the India-Bangladesh Friendship Pipeline Project (IBFPP) is to establish a connection between Siliguri in West Bengal, India, and Parbatipur in the Dinajpur district of Bangladesh.Statement II: The project is a collaborative effort undertaken by Indias Numaligarh Refinery Limited and Bangladeshs Meghna Petroleum Limited.a)Only statement I is correct.b)Only statement II is correct.c)Both statements are correct.d)Both statements are incorrect.Correct answer is option 'C'. Can you explain this answer?.
Solutions for Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q.Consider the following statements and mark the correct option.Statement I: The objective of the India-Bangladesh Friendship Pipeline Project (IBFPP) is to establish a connection between Siliguri in West Bengal, India, and Parbatipur in the Dinajpur district of Bangladesh.Statement II: The project is a collaborative effort undertaken by Indias Numaligarh Refinery Limited and Bangladeshs Meghna Petroleum Limited.a)Only statement I is correct.b)Only statement II is correct.c)Both statements are correct.d)Both statements are incorrect.Correct answer is option 'C'. Can you explain this answer? in English & in Hindi are available as part of our courses for CLAT. Download more important topics, notes, lectures and mock test series for CLAT Exam by signing up for free.
Here you can find the meaning of Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q.Consider the following statements and mark the correct option.Statement I: The objective of the India-Bangladesh Friendship Pipeline Project (IBFPP) is to establish a connection between Siliguri in West Bengal, India, and Parbatipur in the Dinajpur district of Bangladesh.Statement II: The project is a collaborative effort undertaken by Indias Numaligarh Refinery Limited and Bangladeshs Meghna Petroleum Limited.a)Only statement I is correct.b)Only statement II is correct.c)Both statements are correct.d)Both statements are incorrect.Correct answer is option 'C'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q.Consider the following statements and mark the correct option.Statement I: The objective of the India-Bangladesh Friendship Pipeline Project (IBFPP) is to establish a connection between Siliguri in West Bengal, India, and Parbatipur in the Dinajpur district of Bangladesh.Statement II: The project is a collaborative effort undertaken by Indias Numaligarh Refinery Limited and Bangladeshs Meghna Petroleum Limited.a)Only statement I is correct.b)Only statement II is correct.c)Both statements are correct.d)Both statements are incorrect.Correct answer is option 'C'. Can you explain this answer?, a detailed solution for Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q.Consider the following statements and mark the correct option.Statement I: The objective of the India-Bangladesh Friendship Pipeline Project (IBFPP) is to establish a connection between Siliguri in West Bengal, India, and Parbatipur in the Dinajpur district of Bangladesh.Statement II: The project is a collaborative effort undertaken by Indias Numaligarh Refinery Limited and Bangladeshs Meghna Petroleum Limited.a)Only statement I is correct.b)Only statement II is correct.c)Both statements are correct.d)Both statements are incorrect.Correct answer is option 'C'. Can you explain this answer? has been provided alongside types of Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q.Consider the following statements and mark the correct option.Statement I: The objective of the India-Bangladesh Friendship Pipeline Project (IBFPP) is to establish a connection between Siliguri in West Bengal, India, and Parbatipur in the Dinajpur district of Bangladesh.Statement II: The project is a collaborative effort undertaken by Indias Numaligarh Refinery Limited and Bangladeshs Meghna Petroleum Limited.a)Only statement I is correct.b)Only statement II is correct.c)Both statements are correct.d)Both statements are incorrect.Correct answer is option 'C'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice Directions: Read the passage and answer the question that follows.The Numaligarh Refinery Ltd (NRL) has planned to invest Rs 35,000 crore for completion of its five major ongoing projects, including the India-Bangladesh Friendship Pipeline (IBFPL), in the next five years. The company is determined to execute the major ongoing initiatives, namely, Numaligarh Refinery expansion, Paradip Numaligarh crude oil pipeline and crude oil import terminal at Paradip, 2G ethanol project and IBFPL. The projects will enable long-term business growth, and completion of these initiatives without any time and cost overrun remains the core focus area of the company. The approved cost of the expansion project is Rs 18,968 crore and as on June 30, 2022, the physical progress was 14.1 per cent and the cumulative financial commitment was Rs 11,996 crore. The approved cost of the crude oil pipeline and terminal projects is Rs 9,058 crore and by the end of the first fiscal of the current fiscal, the physical progress was 27.5 per cent while the financial progress was 33.01 per cent. Regarding the IBFPL project, the CMD said it has been targetted to be commissioned by October, 2022 and the overall physical progress till June 30 this year is 92.7 per cent.[Source - www.business-standard.com, September 20, 2022]Q.Consider the following statements and mark the correct option.Statement I: The objective of the India-Bangladesh Friendship Pipeline Project (IBFPP) is to establish a connection between Siliguri in West Bengal, India, and Parbatipur in the Dinajpur district of Bangladesh.Statement II: The project is a collaborative effort undertaken by Indias Numaligarh Refinery Limited and Bangladeshs Meghna Petroleum Limited.a)Only statement I is correct.b)Only statement II is correct.c)Both statements are correct.d)Both statements are incorrect.Correct answer is option 'C'. Can you explain this answer? tests, examples and also practice CLAT tests.
Explore Courses for CLAT exam

Top Courses for CLAT

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev