Class 10 Exam  >  Class 10 Questions  >  2 men and 7 boys can do a piece of work in 4 ... Start Learning for Free
2 men and 7 boys can do a piece of work in 4 days . the same work is done in 3days by 4 men and 4 boys . how long would it take one man one boy to do it
Most Upvoted Answer
2 men and 7 boys can do a piece of work in 4 days . the same work is d...
**Given Information:**
- 2 men and 7 boys can do a piece of work in 4 days.
- 4 men and 4 boys can do the same work in 3 days.

**Let's Calculate their individual Efficiency:**

To find out how long it would take one man and one boy to do the work, we need to calculate their individual efficiencies first.

Let's assume the efficiency of one man is 'm' and the efficiency of one boy is 'b'.

**Efficiency Calculation:**

From the given information, we can create the following equations:

- (2m + 7b) * 4 = 1 (Equation 1)
- (4m + 4b) * 3 = 1 (Equation 2)

Since both equations equal to 1 (which represents the whole work), we can simplify them:

- 8m + 28b = 1/4 (Equation 1 simplified)
- 12m + 12b = 1/3 (Equation 2 simplified)

**Solving the System of Equations:**

To find the values of 'm' and 'b', we can solve this system of equations using any method (substitution, elimination, or matrix).

Let's solve it using the substitution method:

From Equation 1: 8m + 28b = 1/4

Solving for 'm':
- 8m = 1/4 - 28b
- m = (1/4 - 28b)/8

Substituting the value of 'm' into Equation 2:

12((1/4 - 28b)/8) + 12b = 1/3

Simplifying and solving for 'b':
- 3(1/4 - 28b) + 12b = 1/3
- 3/4 - 84b + 12b = 1/3
- 3/4 - 72b = 1/3
- 3 - 288b = 4
- -288b = 1
- b = -1/288

Substituting the value of 'b' into Equation 1 to find 'm':

8m + 28(-1/288) = 1/4
8m - 7/72 = 1/4
8m = 1/4 + 7/72
8m = 9/36 + 7/72
8m = 25/72
m = (25/72)/8
m = 25/576

So, the efficiency of one man is 25/576 and the efficiency of one boy is -1/288.

**Calculating the Time taken by one Man and one Boy:**

To find out how long it would take one man and one boy to do the work, we can calculate their combined efficiency.

- Combined Efficiency = Efficiency of one man + Efficiency of one boy
- Combined Efficiency = (25/576) + (-1/288)
- Combined Efficiency = 23/576

Now, we can calculate the time taken by one man and one boy using their combined efficiency:

- (1/1) / (23/576) = 576/23

Therefore, it would take one man and one boy approximately
Community Answer
2 men and 7 boys can do a piece of work in 4 days . the same work is d...
men=15daysboy=60days
Attention Class 10 Students!
To make sure you are not studying endlessly, EduRev has designed Class 10 study material, with Structured Courses, Videos, & Test Series. Plus get personalized analysis, doubt solving and improvement plans to achieve a great score in Class 10.
Explore Courses for Class 10 exam

Top Courses for Class 10

2 men and 7 boys can do a piece of work in 4 days . the same work is done in 3days by 4 men and 4 boys . how long would it take one man one boy to do it
Question Description
2 men and 7 boys can do a piece of work in 4 days . the same work is done in 3days by 4 men and 4 boys . how long would it take one man one boy to do it for Class 10 2024 is part of Class 10 preparation. The Question and answers have been prepared according to the Class 10 exam syllabus. Information about 2 men and 7 boys can do a piece of work in 4 days . the same work is done in 3days by 4 men and 4 boys . how long would it take one man one boy to do it covers all topics & solutions for Class 10 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for 2 men and 7 boys can do a piece of work in 4 days . the same work is done in 3days by 4 men and 4 boys . how long would it take one man one boy to do it.
Solutions for 2 men and 7 boys can do a piece of work in 4 days . the same work is done in 3days by 4 men and 4 boys . how long would it take one man one boy to do it in English & in Hindi are available as part of our courses for Class 10. Download more important topics, notes, lectures and mock test series for Class 10 Exam by signing up for free.
Here you can find the meaning of 2 men and 7 boys can do a piece of work in 4 days . the same work is done in 3days by 4 men and 4 boys . how long would it take one man one boy to do it defined & explained in the simplest way possible. Besides giving the explanation of 2 men and 7 boys can do a piece of work in 4 days . the same work is done in 3days by 4 men and 4 boys . how long would it take one man one boy to do it, a detailed solution for 2 men and 7 boys can do a piece of work in 4 days . the same work is done in 3days by 4 men and 4 boys . how long would it take one man one boy to do it has been provided alongside types of 2 men and 7 boys can do a piece of work in 4 days . the same work is done in 3days by 4 men and 4 boys . how long would it take one man one boy to do it theory, EduRev gives you an ample number of questions to practice 2 men and 7 boys can do a piece of work in 4 days . the same work is done in 3days by 4 men and 4 boys . how long would it take one man one boy to do it tests, examples and also practice Class 10 tests.
Explore Courses for Class 10 exam

Top Courses for Class 10

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev