Ratle Hydro Electric Project is a run-of-river hydroelectric project being built on:
  • a)
    Kaveri
  • b)
    Sutlej
  • c)
    Chenab
  • d)
    Brahmaputra
Correct answer is option 'C'. Can you explain this answer?
Verified Answer
Ratle Hydro Electric Project is a run-of-river hydroelectric project b...
The government recently announced diversion of Chenab river water through diversion tunnels to expedite the 850-MW Ratle Hydro Electric Project in Jammu & Kashmir.
About Ratle Hydro Electric Project:
  • It is an 850 MW run-of-river hydroelectric power project being built on the Chenab River in the Kishtwar District of Jammu and Kashmir.
  • The project is being developed by Ratle Hydroelectric Power Corporation (RHPCL), which was formed as a joint venture (JV) between Jammu & Kashmir State Power Development Corporation (JKSPDC) and India’s state-owned National Hydroelectric Power Corporation (NHPC).
  • The project comprises a 133-meter-talland 194.8-meter-longconcrete gravity dam, a diversion dam, and an underground powerhouse on the right bank of the river.
Key Facts about Chenab River:
  • It is a major river of India and Pakistan.
  • Origin: It is formed by the confluence of two streamsChandra and Bhaga, at Tandi in the upper Himalayas in the Lahaul and Spiti Districts of Himachal Pradesh.
  • In its upper reaches, it is also known as the Chandrabhaga.
  • It is a tributary of the Indus River.
  • Course:
  • It flows west through Jammu and Kashmir union territory, between the steep cliffs of the Siwalik Range (south) and the Lesser Himalayas (north).
  • Turning southwest, it continues into Pakistan, descending from the uplands into the broad alluvial lowlands of Punjab province. 
  • After receiving the Jhelum River near Trimmu, the Chenab empties into the Sutlej River, a tributary of the Indus River.
  • Its total length is about 605 miles (974 km) and it feeds several irrigation canals. 
  • Tributaries: The tributaries of the Chenab River include Miyar Nalla, Sohal, Thirot, Bhut Nalla, Marusudar, and Lidrari. 
Hence option c is the correct answer.
View all questions of this test
Explore Courses for UPSC exam

Similar UPSC Doubts

Top Courses for UPSC

Ratle Hydro Electric Project is a run-of-river hydroelectric project being built on:a)Kaverib)Sutlejc)Chenabd)BrahmaputraCorrect answer is option 'C'. Can you explain this answer?
Question Description
Ratle Hydro Electric Project is a run-of-river hydroelectric project being built on:a)Kaverib)Sutlejc)Chenabd)BrahmaputraCorrect answer is option 'C'. Can you explain this answer? for UPSC 2025 is part of UPSC preparation. The Question and answers have been prepared according to the UPSC exam syllabus. Information about Ratle Hydro Electric Project is a run-of-river hydroelectric project being built on:a)Kaverib)Sutlejc)Chenabd)BrahmaputraCorrect answer is option 'C'. Can you explain this answer? covers all topics & solutions for UPSC 2025 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for Ratle Hydro Electric Project is a run-of-river hydroelectric project being built on:a)Kaverib)Sutlejc)Chenabd)BrahmaputraCorrect answer is option 'C'. Can you explain this answer?.
Solutions for Ratle Hydro Electric Project is a run-of-river hydroelectric project being built on:a)Kaverib)Sutlejc)Chenabd)BrahmaputraCorrect answer is option 'C'. Can you explain this answer? in English & in Hindi are available as part of our courses for UPSC. Download more important topics, notes, lectures and mock test series for UPSC Exam by signing up for free.
Here you can find the meaning of Ratle Hydro Electric Project is a run-of-river hydroelectric project being built on:a)Kaverib)Sutlejc)Chenabd)BrahmaputraCorrect answer is option 'C'. Can you explain this answer? defined & explained in the simplest way possible. Besides giving the explanation of Ratle Hydro Electric Project is a run-of-river hydroelectric project being built on:a)Kaverib)Sutlejc)Chenabd)BrahmaputraCorrect answer is option 'C'. Can you explain this answer?, a detailed solution for Ratle Hydro Electric Project is a run-of-river hydroelectric project being built on:a)Kaverib)Sutlejc)Chenabd)BrahmaputraCorrect answer is option 'C'. Can you explain this answer? has been provided alongside types of Ratle Hydro Electric Project is a run-of-river hydroelectric project being built on:a)Kaverib)Sutlejc)Chenabd)BrahmaputraCorrect answer is option 'C'. Can you explain this answer? theory, EduRev gives you an ample number of questions to practice Ratle Hydro Electric Project is a run-of-river hydroelectric project being built on:a)Kaverib)Sutlejc)Chenabd)BrahmaputraCorrect answer is option 'C'. Can you explain this answer? tests, examples and also practice UPSC tests.
Explore Courses for UPSC exam

Top Courses for UPSC

Explore Courses
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev