GATE Exam  >  GATE Questions  >  Common data for Question 10 to 11. A 125/100 ... Start Learning for Free
Common data for Question 10 to 11. A 125/100 V, single phase auto-transformer takes 30 A current at 0.24 pf when LV side is shorted and HV side is connected to 5 V supply. 1). Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the secondary side draws 50 A current at unity pf. 2).Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the TD) secondary side draws 50 A current at 0.8 lagging pf.?
Explore Courses for GATE exam

Similar GATE Doubts

Common data for Question 10 to 11. A 125/100 V, single phase auto-transformer takes 30 A current at 0.24 pf when LV side is shorted and HV side is connected to 5 V supply. 1). Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the secondary side draws 50 A current at unity pf. 2).Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the TD) secondary side draws 50 A current at 0.8 lagging pf.?
Question Description
Common data for Question 10 to 11. A 125/100 V, single phase auto-transformer takes 30 A current at 0.24 pf when LV side is shorted and HV side is connected to 5 V supply. 1). Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the secondary side draws 50 A current at unity pf. 2).Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the TD) secondary side draws 50 A current at 0.8 lagging pf.? for GATE 2024 is part of GATE preparation. The Question and answers have been prepared according to the GATE exam syllabus. Information about Common data for Question 10 to 11. A 125/100 V, single phase auto-transformer takes 30 A current at 0.24 pf when LV side is shorted and HV side is connected to 5 V supply. 1). Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the secondary side draws 50 A current at unity pf. 2).Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the TD) secondary side draws 50 A current at 0.8 lagging pf.? covers all topics & solutions for GATE 2024 Exam. Find important definitions, questions, meanings, examples, exercises and tests below for Common data for Question 10 to 11. A 125/100 V, single phase auto-transformer takes 30 A current at 0.24 pf when LV side is shorted and HV side is connected to 5 V supply. 1). Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the secondary side draws 50 A current at unity pf. 2).Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the TD) secondary side draws 50 A current at 0.8 lagging pf.?.
Solutions for Common data for Question 10 to 11. A 125/100 V, single phase auto-transformer takes 30 A current at 0.24 pf when LV side is shorted and HV side is connected to 5 V supply. 1). Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the secondary side draws 50 A current at unity pf. 2).Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the TD) secondary side draws 50 A current at 0.8 lagging pf.? in English & in Hindi are available as part of our courses for GATE. Download more important topics, notes, lectures and mock test series for GATE Exam by signing up for free.
Here you can find the meaning of Common data for Question 10 to 11. A 125/100 V, single phase auto-transformer takes 30 A current at 0.24 pf when LV side is shorted and HV side is connected to 5 V supply. 1). Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the secondary side draws 50 A current at unity pf. 2).Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the TD) secondary side draws 50 A current at 0.8 lagging pf.? defined & explained in the simplest way possible. Besides giving the explanation of Common data for Question 10 to 11. A 125/100 V, single phase auto-transformer takes 30 A current at 0.24 pf when LV side is shorted and HV side is connected to 5 V supply. 1). Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the secondary side draws 50 A current at unity pf. 2).Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the TD) secondary side draws 50 A current at 0.8 lagging pf.?, a detailed solution for Common data for Question 10 to 11. A 125/100 V, single phase auto-transformer takes 30 A current at 0.24 pf when LV side is shorted and HV side is connected to 5 V supply. 1). Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the secondary side draws 50 A current at unity pf. 2).Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the TD) secondary side draws 50 A current at 0.8 lagging pf.? has been provided alongside types of Common data for Question 10 to 11. A 125/100 V, single phase auto-transformer takes 30 A current at 0.24 pf when LV side is shorted and HV side is connected to 5 V supply. 1). Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the secondary side draws 50 A current at unity pf. 2).Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the TD) secondary side draws 50 A current at 0.8 lagging pf.? theory, EduRev gives you an ample number of questions to practice Common data for Question 10 to 11. A 125/100 V, single phase auto-transformer takes 30 A current at 0.24 pf when LV side is shorted and HV side is connected to 5 V supply. 1). Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the secondary side draws 50 A current at unity pf. 2).Estimate the secondary voltage (in V) if HV side is connected to 125 V supply and the load at the TD) secondary side draws 50 A current at 0.8 lagging pf.? tests, examples and also practice GATE tests.
Explore Courses for GATE exam
Signup for Free!
Signup to see your scores go up within 7 days! Learn & Practice with 1000+ FREE Notes, Videos & Tests.
10M+ students study on EduRev